Power Crisis: Ghana Gas to Begin Maximum Production By End Of December

The Ghana Gas company limited is awaiting permit from the Energy Commission to produce the maximum amount of gas possible to generate about 550MW of electricity, enough to end the ongoing load shedding.

 
Recipient Email: *
 
Your name: *
Your Email: *