Email News
VRA assures of more power by end of February
The Volta River Authority (VRA) has assured the nation that the Takoradi Thermal Plant 3 (T3) with an installed capacity of 132 MW would be fully operational by the end of February.
Recipient Email:
*
Your name:
*
Your Email:
*