Flood Control Drains: Audit Report Reveals Abnormalities

An audit of the provision of flood control drains has revealed that out of the 30 kilometres of storm drain targeted to be constructed by the Hydrological Service Department (HSD) of the Ministry of Works and Housing in 2017, only 1.3km of the drains was constructed.

 
Recipient Email: *
 
Your name: *
Your Email: *