NPP Has Invested In 18,891 Projects – Bawumia Responds To Mahama With Details

The Vice President, Dr. Mahamudu Bawumia has detailed projects executed by the ruling NPP government within four years in power. 

This is a respond to former President John Mahama that the NPP government has done nothing with the loans acquired from the last four years.

Responding to John Mahama, Dr. Bawumia has detailed various projects that the NPP government has undertaken since assuming power in 2016.

According to Dr. Bawumia, the NPP government has invested in 18,891 projects across all 260 districts of which 10,153 have been completed while 8,738 are still ongoing.

On his Facebook page, Dr. Bawumia wrote that “The former president John Mahama recently asked what the Government of the NPP has used the monies it has borrowed during its term for. I will provide the former president with some answers and only ask that he takes his time to read”

“I note that the former president himself had answered his own question in the video clip below: I will nonetheless provide some information for the education of the former president.

3. The NPP in its first term has undertaken more infrastructure projects than any other Government in its first term in the Fourth Republic. The latest data shows that in total, we have undertaken 18,891 projects, completed 10,153 and have 8,738 ongoing. The details of these projects can be found at the delivery tracker portal:

4. The infrastructure projects across all sectors can be found in all 260 districts in the country. Some of the projects include:

Road Infrastructure (Ongoing and Completed)

• 751 km of Asphaltic Overlay (largest in history)
• Tema Interchange
• Tamale Interchange
• Pokuase Interchange
• PTC Interchange, Takoradi
• Obetsebi-Lamptey interchange
• 79 steel, concrete, and footbridges across the country.
46 of them are completed.
• 46 cocoa road projects completed since 2017
• Bimbilla -Salaga road
• Gushegu- Nalerigu road
• Nakpayili-Wulensi-Kpandai
• Hohoe-Jasikan-Dodopepesu
• Kpando-Nkonya-Worawora
• Nandi Junction-Doedokope
• Krachi-Banda
• Dambai Town roads
• Rehabilitation of selected roads in Agbogbloshie – main road and links
• Reconstruction of Otano Junction to School junction Adjiriganor
• Rehabilitation of Old Fadama Area Reads
• Asphaltic overlay works of selected roads in Adentan Municipality
• Asphaltic Overlay works of selected roads in Okaikwei North Municipality
• Asphaltic Overlay of selected roads in Ablekuma West Municipal Assembly
• Bunkpurugu-Nalerigu-Nakpanduri-Binde road
• Nalerigu-Gbintiri road
• Yagaba-Mankragu road
• Wulugu-Wiase road
• Chereponi Town Roads
• Bunkuprugu Town Roads
• Nalerigu Town Roads
• Walewale Town Roads
• Kete-Krachi Town Roads
• Nkonya – Kwamikrom Road
• Worawora – Jasikan Road
• Kumasi Inner City Roads
• Cape Coast Inner City roads
• Sunyani Inner City roads
• Prestea Inner City Roads
• Accra Inner City Roads
• La Beach Road
• Dualization of Ho Main Road
• Obeyeyie-Amrahia-Ablekuma road
• Dormaa Town roads
• Atebubu town roads
• Atebubu-Kwame-Danso
• Akim-Oda-Ofoasekuma
• Sampa-Jinini
• Bawjiase-Swedru
• Osiem-Begoro
• Anwiankwanta – Obuasi
• Mampong – Kofiase
• Nsuta – Beposo
• Benchimaa – Adjoafua
• Bolga-Bawku – Polmankon
• Bolga – Naaga
• Lawra – Hamile
• Akrodie – Sayereso
• Tepa – Bomaa
• Hwidiem Town Roads
• Kenyasi Town roads
• Mim Town Roads
• Bechem Town roads
• Cape Coast – Twifo Praso
• Mankessim-Ayeldo-Abura
• Dunkwa-Awisem
• Dunkwa Town Roads
• Bridge over river Pra
• Akontombra-Wiawso
• Akontombra-Boadi
• Juaboso-Dadieso
• Juaboso Town Roads
• Daboya – Makarigu roads
• Essan/Debiso Town roads
• Enchi-Elubo
AGRICULTURE (Ongoing and Completed)
• 439 small earth dams (one village one dam) – 375 complete
• 19 irrigation projects
• Pwalugu Multipurpose Dam
• 80 1000MT warehouses (one district one warehouse)
• 100 Green houses and three Greenhouse Training Centres with commercial components, at Dawhenya, Akumadan, and Bawjiase constructed. 

HEALTH (Ongoing and Completed)

• 439 CHPS compounds
• 55 maternity blocks
• 69 Clinics
• Out of 30 health infrastructure projects inherited by the NPP, we have completed 16 of them including 10 polyclinics and 2 district hospitals. There is also ongoing construction of another 9 district hospitals.
• District hospitals starting at Dronbonso, Twedie, Manso Nkwanta, Sobronum, Jumapo, Adukrom, Chiase Kwabeng, Anyinam
• 600 bed regional hospital in Koforidua
• 500 bed military hospital in Afari
• Children and Maternity block at KATH
• Rehabilitation of Tetteh Quarshie, Kibi, and Atibie hospitals
• First ever Infectious disease center – Kwabenya
• Zipline Drone Center – Omenako
• Zipline Drone Center – Walewale
• Zipline Drone Center – Mampong
• Zipline Drone Center – Sefwi Wiawso
• 307 well-equipped state of the art ambulances